Pfaltzgraff Distribution Facility
From written and verbal communication from the owner, we designed and built
the electrical portion of a new distribution facility.
The project necessitated negotiation with the electrical utility company
to get electricity to a site that had no electric power lines on or near it. We designed and installed a lighting
system in the warehouse which included lighting 325' long aisles with fixtures that will only use full power when a
person is present in a particular aisle. At all other times, the light source is cut back to 1/2 of its regular
consumption.
The design/build for this project, not unlike many others, included:
- Power distribution
- Indoor and outdoor lighting
- Emergency generator and UPS installation
- Power and control wiring to equipment, conveyors and HVAC
- CAD drawings