Graham Packaging Farmbrook
This was a design and build project for a plastic bottle manufacturing
plant. This project necessitated coordination between builder, owner and utility company due to the very high electric
usage required for the manufacturing process.
This design/build included:
- 15 KV exterior switchgear and underground service
- (3) 2500 KVA pad mounted transformers
- (3) 4000 ampere services and (3) 4000 ampere switchboards
- exterior lighting
- interior normal lighting
- emergency and exit lighting
- receptacles
- overhead doors and door lights
- electrical services to production equipment
- power and control wire for HVAC equipment
- power and control wire for production equipment
- lighting and HVAC in explosion-proof area